Design Process (P)(F)
Preliminary designs (P) are due 9 weeks prior to performances. These deadlines are centered around Scenic and Costume Designers since their work is due much earlier in the process than that of a Lighting or Sound Designer.
Scenic
- ¼โ ground plan
- paint elevations
- preliminary prop list
- white model
Costumes
- research
- preliminary sketches of each character.
Final designs (F) are due 2 weeks after preliminary designs, or 7 weeks prior to performances.
Scenic
- ½โ ground plan
- ½โ paint elevations
- detail drawings
- sightline/full scale drawings
- full props list with research
- full color model/rendering
Costume packets
- complete color renderings
- fabric swatches

